Rewinding
Perfectly wound packages for smooth downstream processing
Precision rewinding for stable packages and reliable downstream processing
Precision rewinding for stable package performance
After twisting or assembly, yarns are rewound into package formats that ensure stable package build, controlled winding tension, and reliable unwinding behaviour in the customer’s production process.
At TP, rewinding is carried out in a dedicated department using advanced winding equipment, allowing us to deliver perfectly built packages tailored to specific downstream requirements.
The challenge
Maintaining stable package build and unwinding behavior
Improper rewinding can lead to tension variations, unstable packages, and processing interruptions at the customer’s site. High-performance yarns in particular require precise control of package density, winding angle, and traverse ratio to ensure stable package build and reliable unwinding behaviour.
Achieving stable and uniform package build
through controlled package density and winding geometry
Maintaining precise and repeatable winding tension
within defined limits
Ensuring smooth and consistent yarn unwinding
in downstream processes
Adapting package formats and build characteristics
to customer-specific equipment requirements
How TP ensures reliable Rewinding
TP combines advanced machinery with strict process control to guarantee consistent package quality.
1.
Advanced Rewinding technology
-
Dietze + Schell, SSM, and JBF winding systems selected according to yarn type, yarn count, and package build requirements
-
High speed precision winding with controlled and repeatable tension levels within defined limits
-
Optional yarn clearing applied according to yarn type and customer quality requirements to ensure clean and reliable packages
2.
Customer-specific package formats
-
Wide range of tube options selected according to customer equipment and handling requirements
-
Package build and winding geometry tailored to weaving, knitting, braiding, or further processing requirements
-
Flexible package conversion to meet specific production and downstream process needs
3.
In-house quality control
-
Continuous monitoring of defined winding parameters during the rewinding process
-
Controlled winding conditions for every package in accordance with defined process settings and customer specifications
-
Final visual inspection of each tube by trained operators prior to shipment
Why yarn leaders choose TP for rewinding
Stable package build for reliable unwinding performance
Precise tension control during rewinding operations
Optimized winding patterns for downstream processing
Custom package formats tailored to customer equipment
Consistent quality through in-house production and testing
Looking for perfectly wound yarn packages?
Let TP prepare your yarns for smooth and efficient processing.